Skip to content
WareFinhome

Financing options

Loans and leases for warehouse automation, explained.

The right structure depends on whether you want to own the system, how much cash you can put in, and how long you plan to run it. Here is how each option works.

The question you came with: Which financing structure fits my automation project?

  • To own it

    An equipment loan, EFA, or $1-buyout lease ends with the system on your books.

  • To lower payments

    A fair market value lease can reduce the payment in exchange for return or purchase options.

  • To scale in phases

    A master lease adds schedules for each new phase or site.

Structures in scope

Four structures WareFin compares today.

Providers on WareFin offer one or more of these. Your comparison shows them side by side on the same assumptions.

In scope
How each in-scope financing structure handles ownership, payments, end of term, and fit
StructureOwnership during termPaymentEnd of termUsually fits when
Loan / EFAYou own it from day one; the provider holds a security interest, usually with a UCC filing.Fixed or floating, fully amortizing.Nothing owed after the last payment; the lien is released.You want to own the system and keep it long term.
$1-buyout leaseProvider holds title during the term; you carry most of the economic risk and benefit.Fixed. Advance payments are common.You buy the equipment for $1.You want ownership with lease documentation and often higher soft-cost coverage.
FMV leaseProvider owns the equipment.Often the lowest periodic payment, because the residual is not paid down.Return, renew, or buy at fair market value.Technology refresh matters, or you want the lowest payment.
Master leaseDepends on each schedule: $1 buyout or FMV.Set per schedule.Per schedule.Phased rollouts or multisite programs.
  • Equipment loan or equipment finance agreement (EFA)

    You borrow to buy the system and repay over a fixed term. An EFA is documented like a loan for a specific piece of equipment.

    Watch for: How much of the project it covers, especially software and integration, plus prepayment terms.

  • Finance lease with $1 buyout

    A lease in form that works like ownership: fixed payments, then the equipment transfers to you for a nominal amount.

    Watch for: Advance payments due at close and how your accountant classifies the lease.

  • Fair market value (FMV) or operating lease

    You pay to use the system for the term. The provider keeps a residual value at the end, which can lower the payment.

    Watch for: Use and condition limits, return costs, deposits, and the end-of-term purchase price.

  • Master lease

    One umbrella agreement with separate schedules for each phase or site, so each deployment does not need a new contract.

    Watch for: Committed capacity, pricing for future schedules, and cross-default between schedules.

  • Provider-dependent

    Sale-leaseback

    If you recently paid cash for eligible equipment, some providers will buy it and lease it back to restore liquidity. Timing, title, and each provider's rules decide whether it is possible.

Beyond the rate

What actually changes your cost.

Two offers with the same rate can leave very different amounts for you to pay. WareFin compares all of these, on the same dates and assumptions.

How the comparison works
  • Share of the project financed, including soft costs
  • Fees, advance payments, and security deposits at close
  • Residual or balloon left at the end of the term
  • Prepayment and early buyout terms
  • End-of-term options and their price
  • Payment start: at delivery, during installation, or after acceptance

Calculator

Estimate a payment.

Defaults use the sample $1.48M project from the demo.

Payment estimator

Illustrative only

See how amount, term, rate, and an end-of-term residual change a periodic payment. Use it to ask better questions, not to predict an offer.

Share of the amount left at the end of the term.

Monthly payment$30,364
Number of payments60
Sum of payments$1,821,868
End-of-term amount$0

Payments in arrears. Excludes fees, taxes, advance payments, and deposits. Not a quote or commitment; provider documents control final terms.

More tools, including the project cash gap and payback estimators, are in resources.

Later

Usage-based structures are not offered yet.

These may come later, where providers support them. They are not part of the current product and not a launch promise.

Later
  • Later

    Robots as a service (RaaS)

    A subscription that bundles equipment, software, and service.

  • Later

    Pay-per-use

    Payments tied to measured usage such as picks or moves.

  • Later

    Performance or shared savings

    Payments tied to verified operating results.

Compare these structures on your own project.

Upload your integrator quote and WareFin lines up proposals on the same assumptions.